Rain-Ready Driveways: Our Pickerington Project Shows Why Proper Compacting Matters

Double B Excavations & Grade LLC

Ohio Rain - Friend or Foe?

YOU CAN WORK WITH IT OR FIGHT WITH IT - WE CHOOSE THE FORMER

You know what's funny about working on driveways?


Rain is both your biggest challenge and your best teacher.


Every storm shows you exactly where water wants to go and how well you prepared for it.


That's why we're out here in Pickerington today, racing to get everything just right before tomorrow's big rain.

A lot of contractors see rain as the enemy, but we see it differently.


When you build driveways the right way, nature's quality control team actually helps you make sure everything's perfect.


And on this Pickerington project, we're about to show you exactly what that means.

(380) 205-0115

Welcome to Double B!

  • A lush green field with trees and bushes on a sunny day.

Project Overview

We're wrapping up a big one here - 800 tons of asphalt millings to create a uniform, solid driveway. If you're not familiar with what that means, think of it as recycled asphalt that creates a surface that's both durable and practical. When we first got here, the driveway was a mix of different materials - some 57s, some 304s, and scattered limestone. It looked like a patchwork, and more importantly, it wasn't performing like it should.

Our goal? Transform this mixed-up surface into something uniform that's going to hold up through whatever weather Ohio throws at it. The customer wanted something that looks clean and consistent, but we know it needs to do more than just look good - it needs to work right.

Yesterday, we got all the millings laid down, and today we're focusing on those crucial details that make the difference between a driveway that lasts and one that needs constant repairs. It's those edges and proper compacting that separate a good job from a great one.

  • A yellow excavator is digging a path in a backyard.

The Compacting Process

Here's something most people don't think about: compacting isn't just about making the surface hard. It's about creating a surface that works with water instead of against it. Every pass we make with our equipment is purposeful, especially along those edges. Because let's be honest - that's where most driveways start to fail first.

We brought in the dump trailer today with some extra stone to clean everything up. This isn't just about looks - though the customer does appreciate how uniform everything appears now. It's about making sure there aren't any weak spots where water could cause problems later. When you've been doing this as long as we have, you learn that taking these extra steps now saves everyone headaches down the road.

Weather as Quality Control

Yesterday's rain already gave us our first test, and I'm happy to say everything held up exactly like we planned. But tomorrow's storm? That's going to be the real exam. This is actually perfect timing - you couldn't ask for better conditions to prove your work.


See, when rain hits a fresh driveway, it tells you everything you need to know:

  • Where water wants to flow
  • If your grades are right
  • Whether your edges will hold
  • If you've got any low spots that need attention


That's why we're out here today, taking advantage of this nice weather to get everything compacted just right. Some might call us particular, but we'd rather catch and fix any small issues now than deal with bigger problems later.


After all, Ohio weather isn't exactly gentle on driveways - you've got to build them to handle everything from spring storms to winter freeze-thaw cycles.

  • A black house is sitting in the middle of a lush green field.

Key Project Elements

Let's talk about why we chose asphalt millings for this project. When you've got a driveway with different materials scattered around - those 57s, 304s, and limestone we mentioned - you're basically looking at a surface that's fighting against itself. Each material behaves differently when it rains, which is exactly what you don't want.

The millings give us two big advantages. First, everything's uniform, so water moves across it consistently. Second, once it's properly compacted, it creates a surface that's almost like pavement, but with better drainage. Plus, it's more cost-effective for the homeowner in the long run.

Those edges we keep talking about? They're like the frame around a picture - they hold everything together. We take extra time here because if water starts eating away at your edges, it's only a matter of time before you've got bigger problems. That's why we're making sure everything's graded and compacted just right, especially with that storm rolling in tomorrow.

Double B Excavations & Grade LLC

Wrapping it Up

Right now, we're exactly where we want to be with this Pickerington project. The main surface is down, edges are getting their final attention, and we're ready for nature's quality control team to show up tomorrow with that rain.

Here's what we know for sure: when you take the time to do things right - choosing the right materials, paying attention to those details, and working with the weather instead of against it - you end up with a driveway that's going to serve the homeowner well for years to come.

If you've got a driveway that's giving you headaches every time it rains, or you're tired of dealing with mixed materials that just aren't working together, give us a call. We'll show you how doing it right the first time saves you money and stress in the long run. Because at Double B, we don't just build driveways - we build them to last through whatever Ohio weather throws at them.

(380) 205-0115
A man wearing a hoodie and a hat says getting the utilities all straightened out
By Tanner Burdette April 18, 2025
When it comes to building a country driveway, what you can't see matters more than what you can. That's something we're dealing with right now on our latest project in Carroll, where we're installing a 500-foot driveway that's got everything going on underneath - from major gas lines to future septic fields.
A man wearing a hat and a hoodie is sitting in a car.
By Tanner Burdette April 18, 2025
You know what makes an excavator smile on a rainy day? Watching water flow exactly where it's supposed to go. While most folks are rushing to get out of the rain, we're out there watching our drainage work in action. Today's storm wasn't in our work schedule, but it gave us something better - a real-world test of our latest project.
A man wearing a hat and a hoodie is standing in a field.
By Tanner Burdette April 16, 2025
When nature decides to test your work, she doesn't hold back. This week, our latest Pickerington project faced exactly that kind of test - five inches of rain in a single week. That's the kind of rainfall that can turn a property into a muddy mess if the drainage isn't done right.